• Reference
    Hi/PL1/1
  • Title
    Site plans and sections showing the river crossing and the northern and southern bridge approaches comprising: 4 vertical cross sections, 1 longitudinal section and 1 general site plan. Horizontal scale: 3 inches to 100 feet. Vertical scale: 1 inch to 10 feet, Cross section Scale: 1¼ inches to 10 feet
  • Date free text
    1883
  • Production date
    From: 1883 To: 1883
  • Scope and Content
    Engineer: John Webster, Assoc.M.Inst., Stephenson Chambers, 26 Lord Street, Liverpool
  • Format
    plans
  • Reference
  • Level of description
    item