• Reference
    CA2/847/5
  • Title
    Proposed Middle School, Great Barford Contract for the construction of the school, Bedfordshire County Council and Winton Hayes Limited and Barclays Bank Ltd. and plans referred to in the contract and other sketch plans.
  • Date free text
    1973-1974
  • Production date
    From: 1973 To: 1974
  • Scope and Content
    Contract dated 9 July 1974. Drg No 1 Phase I site layout, 6.11.73 Drg No 2 Phase 1 drainage plan, 27.9.73 Drg No 3 Phase 1 elevations 20.9.73 Phase 1 typical section & details of R C Beams Feb 74 Phase 1 roof construction details, hall 16.10.73 Phase 1 site layout no date. Phase 1 ground floor plan A electrical installation Phase 1 ground floor plan B Feb 1974 Phase 1 ground floor plan C Feb 1974 Phase 1 first floor plan electrical installation Feb 1974 Phase 1 fittings layout kitchen details Phase 1 electrical installation schematic diagrams Feb 1974 Caretakers bungalows electrical installation, electricaire heating installation Jan 1974 Sketch layout ground and first floor plan. Arlesey/Henlow layout for playing field. Revised site layout 31.8.73 Phase 1 site layout 6.11.73 Sketch ground floor plan 5.7.73 Sketch first floor plan 5.7.73 Phase 1 drainage layout 23.11.73 Elevations, July 73 Caretakers bungalow Nov 73 General Layout first floor General layout ground floor 27.73 Phase 1 site layout around school 6.11.73
  • Exent
    27
  • Stored off-site 3 days notice required to retreive.
  • Level of description
    file