• Reference
    P1/2/193
  • Title
    Faculty to replace the existing coke-fired boiler of the water heating system with an automatically controlled oil burner, altering the interior structure of the present boiler house to make suitable and safe provision for an oils storage tank, oil burner, circulating pump etc., laying oil pipeline under the churchyard path and flowerbeds from the storage tank to a point accessible for the delivery of fuel, as proposed by Mr. H.A. Sandford
  • Date free text
    30 Sep 1959
  • Production date
    From: 1959 To: 1959
  • Level of description
    item