• Reference
    PCArlesey33/30
  • Title
    Correspondence on flooding including: - flooding etc. from ditch as Ready Mixed Concrete (Transite) Limited works in Hitchin Road [1985-1991]; - flooding of High Street from various causes [1986-1996]; - cleansing of eariwig and other ditches [1990-1992]; - poor drainage at Woodland Chase [1992-1993]; - concern that A507 by-pass might cause flooding of Pix Brook [1992-1993] - flooding in Stotfold Road [1993]; - clogged ditch at Cluny Meadow [1996]
  • Date free text
    1985-1996
  • Production date
    From: 1985 To: 1996
  • Level of description
    item