Reference
GKL11/1/5
Title
Photograph album; photographs of various installations.
Date free text
Not dated. c.1950s
Production date
From: 1950 To: 1959
Scope and Content
1. Meter panel for Brighton Corporation waterworks with 'B' type Venturi recorder mounted in the centre.
2. Panel of remote reading meters supplied to the Rand Water Board, South Africa.
3. Panel of remote reading meters supplied to St. Helens C.B.C. Brown Edge Waterworks.
4. Kent meter panel in the return sludge pumping station, Mogden Sewage Works, West Middlesex. (Front and rear views.)
5. Water panel for 2 turbines at St. Anne's Board Mill, Bristol.
6. 31 ft control panel supplies to Messrs Foster Wheeler Co. Ltd., for Messrs Iraq Petroleum Co. Ltd., Kirkuk.
7. Automatic boiler control and metering panels in the control room at Hackney Power Station, London.
8. Boiler house panel - Hackney Power Station, London.
9. Boiler meter panel supplied to Imperial Chemical Industries Ltd.
10. Automatic boiler control panel (Kent Hydraulic system) at Thorpe power station, Norwich.
11. Remote reading instrument panel for 2 boilers at Halifax power station.
12. One of eleven boiler meter panels supplied to Klip power station, South Africa.
13. Automatic boiler control panel (Hydraulic system) installed at Messrs Rowntrees factory, York.
14. Back and front views of one of three boiler meter panels for East Perth power station (Western Australian Government Electricity Supply)
Level of description
item